Object
New hydrogen production plant with 1MW capacity of alkaline electrolyser.
Activities performed
MULTIDISCIPLINARY detailed design: Process, Piping (including Autocad
Plant 3D development), MEP, Instrumentation & Automation.
Tecnichal bid evaluations for plant items/packages procurement.
Period of performance
2022
Project description
Seingim has developed the engineering for the design of a new modular plant,
consisting of several containers, for the production, storage and distribution
of hydrogen from an electrolytic process (alkaline electrolysis of water). The
new plant will have an installed capacity of 1 MW, with a hydrogen gas productivity
of about 225 Nm3/hour (wet gas from electrolysers) at a maximum
pressure of 30 bar g.