Genoa aquarium

Seingim developed the construction design of all the hot water, seawater, and cooled water distribution lines, starting from the new trigeneration system consisting of a gas-powered co-generator and an absorber.
All the construction details, supports, anchoring, and various couplings necessary were detailed.
Seingim also conducted the structural testing of the existing floors to verify the feasibility of installing new machinery.
The entire job was carried out using the BIM method.

Scopri di più sul nostro portfolio

Explore Other Successful Projects